Saturday, January 30, 2016

Hank's Backhoe Tiny Houses, Point Roberts, WA

A local friend of mine, Jeff Peltier, is building and selling tiny houses in Point Roberts, Washington. The standard versions come unfinished but can be customized to suit.

The tiny houses are independently built in Point Roberts, Washington and can be taken right across the border into neighboring Vancouver, British Columbia. If you're in the lower mainland, Vancouver, or Point Roberts, stop by to see this current tiny house while it's on display across from Nielsen's lumber. 

Visit his website Hank's Backhoe for contact information.

unnamed.jpg
unnamed-2.jpg
unnamed-1.jpg


source Blog - THE small HOUSE CATALOG http://ift.tt/1OYxyrn

Sunday, January 24, 2016

Island House: A "Counter Productive" Week

The kitchen is already in use!

Solid Wood Countertops

It was too good a pun to pass up…This week we installed our wood countertops. It went very smoothly. The cut outs for both the induction cooktop and the undermount sink went very well. We deliberated for some time as to how to cut out for the sink as the undermounting of it meant that any mistakes would be highly visible (read: unacceptable). We considered using a router but in the end used the Festool plunge cut track saw (an expensive but totally useful, incredible tool) for the long cuts on all four sides and then a Makita jigsaw to finish the rounded corners. The Festool orbital sander took care of anything that needed smoothing and overall, it was an easy process and looks lovely.

German Zuhnë undermount stainless steel kitchen sink & Della faucet 

German Zuhnë undermount stainless steel kitchen sink & Della faucet 

Zuhnë Kitchen Sink & Faucet

The undermount sink is made by Zuhnë, a company I recommend checking out if you are looking for high quality, stainless steel sinks. They offer undermount, traditional, and farmhouse sinks. They also offer faucets. All are beautifully made, come with lifetime warranties and are packed with incredible care. All needed parts are included for installation.  Customer service is amazing, any questions you might have and they will do their best to help almost immediately. 

Installing Appliances

After the countertops and sink were installed, we connected the dishwasher and got the cooktop wired in. After that, it was merely to oil the countertops and enjoy cooking in a new space. No more dishes in the bathtub!  

Treads & Risers

From the kitchen we moved out to the stairwell and this week installed the treads and risers. I sanded them today and we finished installing the last bit of flooring in the house which was at the top landing of the stairs. 

Natural pine treads & risers, ready to be varnished. Newel posts & hand rails this week.

Natural pine treads & risers, ready to be varnished. Newel posts & hand rails this week.

Odds & Ends (and mostly trash)

Our last major accomplishment for the week was to take the garage full of cardboard recycling and disturbing amount of styrofoam packing boards to the transfer station. While it sounds a small thing, it was actually a huge delight to see that the garage is now open again and a regained work space. 

Upcoming...stairs.

The unfolding week will have us build newel posts for the stairs and then install the handrail. I plan to finish all the floor varnishing this week - the stairwell, master bedroom and second floor hallway are all that remain to be done. It’s possible that we’ll also get shelving installed in the built in bookcases this week, but the stairs remain primary. This week’s work has brought a lot of enjoyment and seemed to come together with great ease…an unlooked for treat!



source Blog - THE small HOUSE CATALOG http://ift.tt/1WIwmeN

Monday, January 18, 2016

Island House: kitchen cabinets & wheelbarrow work

kitchen cabinets carcass

Kitchen cabinets

This past week we’ve worked primarily in the kitchen, building the plywood substructure of the cabinetry. What a difference it makes to see an empty room, that could really be any room, develop a shape that is unmistakably "kitchen". It’s pleasing to see the skeleton of its future become apparent. Shawn used ¾” urea formaldehyde-free ACX plywood and together we cut the pieces down using both a track saw and a table saw and then used pocket hole joinery to put them together using a Kreg jig. Once in place, they could be affixed to the walls and floor. The lower cabinets went together easily and the upper cabinets were not difficult to install, as the plywood keeps things so share.  Yesterday’s coup was to install the oven in place, looks beautiful and works! The range hood is also installed. Now it’s time to put on the counter tops so that the sink can be placed (looking forward to this immensely as it means goodbye to dishes in the bathtub!) as well as the cooktop. So later this week we should be able to use a genuinely semi-finished kitchen. It will be fun after moving about the downstairs room with my portable kitchen (which actually works beautifully despite being an assortment of mini appliances sitting atop plywood over sawhorses).

Outside with my wheelbarrow

I took some of the good warm days this week to lay down a cover layer of ⅝” crushed rock from a nearby quarry on the backfill around the house. We used cleaned construction rubble as the fill for our stone retaining wall (a huge savings over gravel) which was highly effective but grating to look at after many months. The crushed rock is a beautiful blue black and settles to a smooth, packed but permeable surface that soothes the eye and is wonderfully free of little exposed chunks of brick and concrete and stones. I’ve a bit more work to do with the gravel, but 12 yards out of 15 are settled in their new homes. Somehow it’s a bit sad to be coming to the end of the enormous gravel pile (although our ancient wheelbarrow may disagree with my sentiments).

BEFORE

BEFORE

AFTER

AFTER

Coming soon: stairs & treads

Once the basics of the kitchen are up and running, it will be time for Shawn to shift gears and finish the stairs (we’ll be installing permanent stair treads and risers this week) and think about installing the main floor ceiling, which will be tongue in groove pine. Then will be casings for windows and doors (we are in the process of ordering doors) and trim moulding. Shawn decided that he wanted to focus all of his attentions on the cabinetry (which he enjoys building) without a lot of small projects knocking on his door.



source Blog - THE small HOUSE CATALOG http://ift.tt/1neL7dB

Penguin Random House UK removes degree requirements in recruiting

Penguin Random House UK today announced it was removing any requirementfor a university degree for all new jobs to open up opportunities in publishingand attract a more varied candidate pool and future workforce.Group HR Director, Neil Morrison, said there was increasing evidencethat there is no simple correlation between having a degree and ongoingperformance in work and, within Penguin Random Ho...

source Random House Group Latest News http://ift.tt/1PlrAxL

Wednesday, January 6, 2016

Island House: Naturally Varnished Pine Flooring

What we've been doing since November

A working master bathroom - yay!

A working master bathroom - yay!

November was busy with Shawn completing inspections for electrical, plumbing, heating and mechanical and then the drywallers arriving to do the entire sheetrock job for us inside. It was our first time ever having professionals do the work. It was a liberating experience, to say the least. What would have taken us six months, they did in three weeks total. The hangers came and put up all the drywall in one day, then the taping and mudding person came and got all the seams covered and mudded. Lastly, the finishing mud was put on. We opted for a textured mud to go on the walls. It gives the suggestion of plaster and has a neat texture. The week before Thanksgiving, it was up to us to carry on with the project.

For a change, Shawn stayed at our rental and worked on his drafting work while I went to the house and got the priming done before a planned departure for most of the month of December (it was time for a break from the job site!). Before leaving, I wanted to get the entire upstairs primed and painted, so that Shawn could start work on the floor. I was able to do that before Thanksgiving. After Thanksgiving, it was time to prepare to move out of our rental (hooray!!) and then leave for a three week visit to see friends in Pt. Roberts.  I wasn’t able to prime the entire downstairs, but I did get some of it done including priming and painting the kitchen. We also brought our 1 x 6” unfinished pine flooring in to acclimate just before Thanksgiving. The plan was for it to have a week or so to come to temperature and then for Shawn to install the flooring while I was in Pt. Roberts, joining me there after a week for a break of his own. This worked out well. While I was away, he installed the flooring upstairs and down and got the upstairs bathroom in working order, with toilet, tub and shower.
 

Hand finishing pine floors with natural varnish

Me, hand sanding the kitchen floor.

Me, hand sanding the kitchen floor.

While three weeks seems like a long time to be away, it flew past and before we knew it, it was after Christmas and we were back at the house. For me, it was the first time seeing the flooring installed and it was stunning to see in “real life” rather than just pictures. Now, a new set of projects came onto the boards. My primary focus was on completing priming and painting throughout the house, and then starting the finishing of the floors. The painting was a good way for me to get back into the swing of working on the house. We also found out that the couch and chairs we ordered (after 8 years without!!) are arriving on the 12th of January, so that was the deadline I needed to get going on the floor finishing. For the floors, we opted to use a natural clear coat varnish. We didn’t want to whitewash the floors again but wanted to use another natural, non VOC containing product. After a fair amount of research, we discovered a company called Ecos Paints that offers a product called Wood Shield. 

Rolling on the second coat of Woodshield Satin Varnish by Ecos Paints!

Rolling on the second coat of Woodshield Satin Varnish by Ecos Paints!

I am always nervous when using a new product in such a high visibility area but my concerns about this product were unfounded. I followed the simple label directions and sanded, vacuumed and then mopped the floor, allowed it to dry and then applied one coat of varnish using a roller. After 4 hours, I applied a second coat. Beautiful results. A nice hard surface, even coats, nice distribution and such a pretty shine. We both marveled at the new appearance of the pine. It looked nice unfinished, but the finish captures a wet look, deepening the color a bit and giving a pleasant shine to the floors. The surface feels well protected. Thus far I’ve done the second bedroom, the bathrooms and the main living room/foyer area. I also got half the kitchen done. Shawn will be starting kitchen cabinetry tomorrow and needed at least half the kitchen done. I can’t do the other half till we can move all the appliances into their places. The living room is now ready for its long awaited furniture to arrive next week. The cat has not appreciated being shunted into her carrier for a few hours at a time, but at least she has windows to look out of while incarcerated, and there are no curious cat prints tracking across our floors.
 

Woodshield by Ecos Paints naturally varnished pine floor (Woodshield by Ecos Paints) zero-VOC floor varnish by Ecos Paints

Preparing to start the kitchen

Shawn has been drafting both for clients and for our kitchen layout as well as installing switches, plugs, and lighting throughout the house. He installed the washer dryer unit and also installed sink cabinets in both bathrooms and the downstairs toilet. While there’s a way to go yet, we are really down to cabinetry and trim inside. Having the drywalling done for us by professionals was a real coup for us in terms of setting us ahead of the finishing process. We were so glad with the work they (Miller Drywall of Friday Harbor, WA) did and how well the tricky angles in the upstairs bathroom and second bedroom (where the clipped gables are) came out. It was well worth the cost.

A bit of time away from our project amongst truly missed friends and environs was a great way to end our 2015 and get us rolling on the completion of our island project this year. We are aiming to be completed by early May (on account of needing some warmer weather to finish the siding work remaining). We will now update our progress more regularly, and the updates should be more interesting as it’s back to finishing work; always gratifying and enjoyable to see finishing work take place.



source Blog - THE small HOUSE CATALOG http://ift.tt/1SBdWfI

Thursday, December 31, 2015

No. 26 - The Cottonwood Cottage

The Cottonwood Cottage was designed by Curt Lyons, a designer-builder currently living in a beautiful tiny house on wheels that he built on his property in Fort Collins, Colorado (watch video). Curt has generously offered to share his house, which was drafted by THE small HOUSE CATALOG in 2014. 

He's also taken the time to introduce the house and talk about some of the philosophy behind the design.


Designed by Curt Lyons, designer-builder, Fort Collins, CO. & drafted by THE small HOUSE CATALOG.

Curt Lyons talks about Cottonwood Cottage:

I am happy to offer the plans for the Cottonwood Cottage after working to create them in collaboration with Shawn.  At first glance it might just appear to be a typical two bedroom Craftsman style bungalow, but there is a little more to it that needs explaining. My overall goal was a simple, smaller house, that maximized its footprint while trying to keep the overall massing down for efficiency as well as aesthetics. I wanted an open floor plan, where the living room and kitchen flowed together, since meal preparation, before and after work is the majority of time people get to spend awake in their house. The design was kept simple with the intent of keeping costs down, and making it easier to build. This simplicity is revealed in the exposed structure of posts and beam, exposed joists and tongue and groove flooring for the second floor, which is the visible ceiling below. 

I have since had to postpone building the house for myself for now, so I contacted Shawn to make my plans available to you, for free. A lot of thought went into the design and I would love to see it get built. 

My overall goals included:

Curt is an interesting guy and you can read more about him in The Coloradoan.

  • Envelope: A well insulated tight building envelope
  • Passive solar: Ability to use passive techniques to help heat and cool the house. 
  • Practical: A house that was about practicality versus pretentiousness. 
  • Size: With a footprint of 640 s/f downstairs, it is less than half the 2600 s/f average American house today. 
  • Open: Removing halls maximized the floor plan  
  • Heating: When I learned about air source heat pumps (mini splits) I decided I wanted to use one, as well as a wood stove 
  • PV: The roof is oriented with lots of south exposure to try to go for a net-zero energy house
  • Porches: I have always enjoyed porches, but never lived with one and they allow space and function to flow from inside to outside. 
  • Massing: I really wanted the house to be appear modest and fit in an existing neighborhood
  • Green: Sustainability went into every decision from size to materials. 
  • Cost: Could it be built without a 30 year mortgage. 

For those interested in more detail, read on for more of the reasoning and thought process involved in the design. My background includes construction and I am also a bit of a designer. 

cottonwood cottage 2 story

Envelope:

I designed this house to be built on a site in Fort Collins, CO which is in climate zone 4. Being aware of third party certifications such as LEED, and Passivhaus, I decided pretty early that I could build to a better house and put the money that would go into that plaque on the wall into the house itself. Those certifications can make sense to academics and engineers who sometimes seem more motivated by bragging rights as opposed to the bigger picture of sustainability. The bottom line, insulation is relatively cheap, and building smaller is a low hanging fruit when it comes to making a house with less impact on the environment. I prefer cellulose to petroleum based foams, and with everything in life, there is a diminishing return on more of something. We ended up with an 8” double stud walls which would have an R-value of around 30, and if it was only R-28 that's still above code and pretty darn good. 

Passive Solar:

Colorado is a natural place for this decision. In the winter we still have lots of sunny days even when it's cold, while during the summer night time temperatures cool down allowing for a cooling stack effect.  The house is designed to be oriented with the long access east to west, with windows on the south that can get solar gain in winter and be shaded in the summer. Windows on the north were minimized to keep down heat loss, which was also the reason for no skylights. 

Size:

The overall square footage is around 1000 square feet, I say around because measuring square footage upstairs with sloped ceilings gets tricky. The plans show a 4' knee wall but I think I would drop those to one or two feet since there is a shed dormer and other than changing clothes, most of what I do in a bedroom is horizontal. There is no bedroom downstairs simply because I didn't want to the lengthen the footprint and close off the windows on the west end of the house. As for aging in place, I am going to take the approach of the world's healthiest elderly as in Dan Buettner's TED talk on Blue Zones

Heating:

Wood stoves have a controversial reputation that I don't think they deserve. They may not make sense everywhere, but where I live in CO, we have thousands of acres of standing dead beetle kill pine. These trees will either burn in a forest fire, or burn in a stove to heat a house, or fall over and eventually rot. All three options will release the carbon they have absorbed in their lifetime. The other heat source is planned to be an air source heat pump/ductless mini split. These little units are cost effective, also work as air conditioners, and are designed for open floor plans with positive reports are coming back from as far north as Maine. The house may need two units one up and one downstairs. To learn more about them I recommend reading articles in the Green Building Adviser.  

Lastly:

While it is all to often defined as being less bad than previous examples, I define sustainable as being infinitely repeatable with no accumulating deterioration, such as a healthy ecosystem. By that definition, it's pretty hard to build a sustainable house in the modern world, but we can build a lot more sustainably then we have been. Build it smaller, make it to last, make it beautiful so people will want to keep it around, use renewable materials when possible, make it so it doesn't need much to function, work with your environment and remember to enjoy the process. 

Please share your thoughts, questions and gratitude below. I'll be sure Curt is able to reply to questions about the plan and his ideas.


The Cottonwood Cottage floor plan

House plan details

  • Bedrooms: 2
  • Bathrooms: 1-1/2
  • Floors: 2
  • Conditioned space: 1,096 sq ft > 5'
  • Main floor: 588 sq ft
  • Upper floor: 508 sq ft (stairs counted once)
  • Overall dimensions including porch:  20' x 32' + 3' x 8'-4' bump-out
  • Foundation type: High crawl space (6'-2")
  • Print size: 24" x 36" (black & white recommended)
  • Immediate PDF download with license to build
  • Design criteria: International Residential Code (IRC)
Download

source Blog - THE small HOUSE CATALOG http://ift.tt/1MK3B9Z