After completing the subfloor and plywood layout over our slab and then taking a long weekend, it was time for us to get to work on the house. Monday we started framing the first walls. By Thursday they were all standing and by Friday it was time to finish air sealing the exterior wall seams with caulk and interior corners with spray foam. We spent the day yesterday hooking up a hose spigot for the soon-to-be planted garden, as well as installing wall cripples and insulating the headers. Today, we plant our garden, our latest start ever, but still very traditional, and should getting the rest of the cripples installed and perhaps tie the walls together with the top plates. Next week…on to plywood sheathing and building the interior load bearing walls.

Some notes:  We raised these walls ourselves in mostly 12 -14 foot sections, which is why we left almost all of the plywood off the exterior; it’s far easier to sheath on the ground, but with just the two of us raising the walls, we didn't want them to become impossibly heavy. We also left off building the full headers until standing to save on weight. It worked well and we were able to keep the walls in great shape in terms of being straight, plumb and level. We’ll be applying plywood vertically rather than horizontally because it is stronger this way as there are fewer seams, an important consideration in our high wind, earthquake prone area.

All in all, it was a fun and satisfying week with straightforward work and lots to show for it. Hope you’ll join us for another update next week!

caulking @ joints
caulking @ joints first floor framing
first floor framing 3-stud corners
3-stud corners insulated headers
insulated headers

source Blog - THE small HOUSE CATALOG http://ift.tt/1cVmvka