It seems like I was just writing up last week’s progress report! We started the week with cooler, cloudy temps and even got some rain on Monday, much needed. It also gave us a chance to take a day off, also much needed.
This week we finished all of the joists for the second floor and completed all of the interior walls, including those that helped frame up the stairwell and the cabinets and closets beneath it. The stairs were the final big project of the week. Shawn cut all the stringers yesterday and we were reminded of Roy Smith, a retired builder in Belfast, ME who answered questions for us along the way as we built our first house there about a decade ago; we raised our hammers in toast to him and appreciated once again his tips on stepping out stairs many years ago that helped us cut our first stringers.
By Saturday we'd completed the main straight run, installed temporary treads and also the second floor landing. We also got our risers spot on at 7 ¾ all the way up - an important calculation for us and pleasant to achieve without trouble.
caulking seams...
While Shawn stepped out and cut the stringers, I spent a good amount of time carefully air sealing the interior walls by running a bead of caulk along any place where studs, trimmers, sills or headers met each other. We have also air sealed the exterior in a similar way. A blower door test is now required to pass the final building inspection and this extra bit of work will help us pass and make the house more energy efficient by preventing air leakage.
This coming week we will be laying out plywood on the second floor and will be feeling very grateful as we hustle it up comfortable stairs rather than hoisting it through the stairwell, one of us up and one of us down. After that’s installed and square, it will be on to framing up the second floor dormers. It is hard to believe that the roof assembly is in close sight. This is the earliest start we have ever gotten on a building project and quite possibly the finest weather we have ever had for one. Please check in again next week for some additional photos and another progress report.
cutting stringers
pocket holes to fasten treads & risers
second floor where our bedroom will be!
source Blog - THE small HOUSE CATALOG http://ift.tt/1HdFwun